Under Tiles Installation Guide

Step by step guide on installing our Techno EPDM membrane under tiles/sales for your next rubber roofing project.

You can download this guide as a PDF here
Step 1

Carefully remove tiles and battens and place to one side.

Step 2

Fold the felt underlay up and tuck under existing tiles.

Step 3

Apply a thin coat of contact adhesive to the rubber membrane and lay board.
Shop EPDM Adhesives

Step 4

Allow both surfaces to dry and, starting from the bottom, mate together, working the rubber into any angle changes.

Step 5

Reinstate the felt underlay and battens over the rubber.

Step 6

Reinstall the tiles.