Onto Tiles Installation Guide
Step by step guide on installation EPDM membrane onto tiles. Installation videos & step-by-step guides for full installation available.
You can download this guide as a PDF here
![]() |
Step 1Allow 150mm overhang onto tiles. |
![]() |
Step 2Dress lead into place 6” onto tiles, 3” onto the deck. We recommend using minimum 9” Code 4 lead cut into 1200mm lengths max. |
![]() |
Step 3Fix into position using screws. |
![]() |
Step 4Apply primer to lead and rubber approx. 160mm wide using scrubber pad and handle. Allow to go touch dry. |
![]() |
Step 5Centralize the 6" batten cover strip and carefully remove release paper applying downward pressure. Use silicone roller to seal. |
Watch our video




