Laying Membrane Installation Guide
Step-by-step guide on laying our Techno EDPM Membrane for your next rubber roofing project.
You can download this guide as a PDF here
![]() |
Step 1Ensure deck is dry and clean. |
![]() |
Step 2Position membrane on the roof and allow it to relax for 30-45 minutes: allow slightly longer in colder temperatures. |
![]() |
Step 3Fold back one half of the rubber and apply an even coat of water-based adhesive to the deck, using a roller and sleeve. For best results, it is essential that the water based deck adhesive is thoroughly stirred with a paddle stirrer prior to use. |
![]() |
Step 4Mate the rubber to the adhesive immediately, and use a soft broom to sweep out any air bubbles. |
![]() |
Step 5Repeat the process for the other side. |
![]() |
Step 6Thoroughly sweep roof. |
Watch our video





