
|
Step 1
Ensure deck is dry and clean. |
|
Step 2
Position membrane on the roof and allow it to relax for 30-45 minutes: allow slightly longer in colder temperatures.
|
|
Step 3
Fold back one half of the rubber and apply an even coat of water-based adhesive to the deck, using a roller and sleeve. For best results, it is essential that the water based deck adhesive is thoroughly stirred with a paddle stirrer prior to use.
|
|
Step 4
Mate the rubber to the adhesive immediately, and use a soft broom to sweep out any air bubbles.
|
|
Step 5
Repeat the process for the other side.
|
|
Step 6
Thoroughly sweep roof.
|